Operation Manual
69 Copyright © Acronis, Inc., 2000-2012
New Replication Task, step 3 "When to replicate"
Replication task scheduling is the same as backup task scheduling. Detailed information on
scheduling options as well as scheduling examples can be found in "When to back up" section (p. 32).
After setting up your replication task schedule, click Next to go to the last step of the wizard.
14.1.4 Replication Options
In the fourth step of the New Replication Task wizard you should define your replication task name.
Note that [ ] { } ; , . symbols are not allowed for the task name.
For replication task preferences click More options.... The following options are available.
1) E-mail notifications.
2) SNMP notifications.
For details see the Notifications section (p. 39).
3) CBT backup.
This option defines whether to utilize the Changed Block Tracking feature of VMWare for the virtual
machines supporting it. The default setting for CBT backup is: Enabled.
CBT backup keeps track of all the changed blocks inside the virtual machine. This significantly reduces
the time for creating backups. The time is reduced because Acronis vmProtect 7 does not need to
check which blocks have changed since the last backup. It gets this information from the VMWare
API.