Operation Manual

77 Copyright © Acronis, Inc., 2000-2012
varying information depending on the task type backup, restore or validation. The sections below
describe the tabs contents for the backup task.
15.6.1 Summary tab
The Summary tab gives overview details of the current selected task. Here is an example of the
possible contents of the Summary tab for the backup task:
Start Time: 12:00 03/04/2011
Remaining time: 30 min
Last Finish Time: N/A
Last Result: N/A
Bytes transmitted: 150Mb
Speed: 20Mb/sec
Schedule: Start the task every 1 hour on Monday, Tuesday
Managing tasks, View task details, Summary tab
15.6.2 Source tab
The Source tab presents the tree of ESX(i) hosts+vApps/VMs included into the backup task. The tree
is build up dynamically. If there was an entire ESX(i) host selected for backup, then this tree will be
shown for the current state of the machines (the same list) same as in VMWare IC. To the right of the
ESX(i) host there should be a mark that the entire group is being backed up ("All virtual machines"
mark). Here is an example of the possible values for the Source tab contents: