Specifications

Union School District CCTV Spec 2014 V 2.0
Bid Proposal Due by 2:00pm Friday May 2, 2014 8
E. It is the Contractors responsibility to submit for approval the complete designed system configuration
and layout showing all devices, wiring, conduit, and locations along with other required information as
specified herein for the completely integrated system proposed for installation
F. Coordination Drawings: Plans drawn to scale and coordinating locations of IP Video Security System
equipment. Show the following:
G. Location of items requiring installation coordination including lighting fixtures, diffusers, grilles,
speakers, sprinklers, access panels, and other architectural features.
H. Product Certificates: Signed by ACTi as Certified for installation of equipment and components
certifying that products furnished to the Contractor comply with requirements
I. Installer Certificates: Signed by ACTi certifying that installers comply with manufacturers requirements
for Installation
J. Field Test Reports: Indicate and interpret test results for compliance with performance requirements
of installed systems
3.9 TRAINING
A. The entire system shall be tested and demonstrated in the presence of Client representatives. The
Contractor shall promptly make all corrections and adjustments necessary for intended operation to
the satisfaction of the owner. Vendor will be required to provide training in the complete use of all
parameters of the system to the staff as part of this contract, at no additional cost. Training should be
configured so as to take a person to a level of competence that will permit their being melded into the
ongoing daily console operations with a minimum of disruption to the integrity of their normal daily
functions. Training is to be provided at the site or a facility maintained either by the vendor or
manufacturer. All expenses such as transportation, lodging and meals are to be borne by the vendor.