Installation Guide

5778-12
For EPDM, PVC or TPO Membrane Flat Roofs
Step 5:
Apply sealant within the square flange outline.
Step 6A:
Place vent within the square outline & attach using a
screw gun or drill.
6B:
Required Screw: #10 x 1.5” steel sheet metal screw
Total number of screws required = 16 (tolerance :1/2”)
Step 7:
Apply roofing cement over the screws and edge of
flange. This is how the Aura Fan should look when
finished.
Page 2 of 2
Installation Instructions for AF-12-C6