Installation, operating and maintenance Instructions N-Mini / N 1 / N 2 / N 3 excellence in hot water 07/09/2004 - 66401000
INDEX INTRODUCTION Who should read these instructions Symbols Applicable standards Important notes USER GUIDE Use of the boiler Setting the burner to safety mode DESCRIPTION General description Operating principle Design characteristics Boiler views and key to parts TECHNICAL CHARACTERISTICS General Operating condition limits Dimensions Hot water output data General characteristics 2 2 2 2 2 3 3 3 4 4 4 4 4 5 5 5 5 5 5 BURNER CHARACTERISTICS Description of the burner Factory settings parameters Bur
INTRODUCTION WHO SHOULD READ THESE INSTRUCTIONS APPLICABLE STANDARDS These instructions should be read by: - the specifying engineer - the installer - the user - the service engineer The products described in this document have been certified at European level (European Directive 92/42/EEC «Efficiency»). They have also been awarded the Belgian “OPTIMAZ” LABEL (fuel oil boiler).
USER GUIDE USE OF THE BOILER Before carrying out any work on the boiler, isolate it from the electrical supply at the switch on the external control box. Also place the main switch on the control panel to “OFF”. You should familiarise yourself with the control panel (fig. 1) The user must not attempt to gain access to the components inside the control panel. 1. Control thermostat When the boiler is used for heating only, the boiler temperature may be set at 60 to 90°C.
DESCRIPTION GENERAL DESCRIPTION Casing • Model N is a single boiler (heating). The boiler is covered with a steel casing that has been stove enamelled at 220°C after scouring and phosphating. • Equipment required: a water connection kit for the heating circuit supply (optional). BOILER VIEWS AND KEY TO PARTS • The N-Mini control panel includes a control thermostat and a thermostat pressure gauge.
TECHNICAL CHARACTERISTICS GENERAL OPERATING CONDITION LIMITS The appliances are supplied fully assembled, tested and packed standing on a timber base with impact protection strips and wrapped in heat-shrunk plastic film. When the appliance arrives, remove the packaging and check that no parts have been damaged in transit.
INSTALLATION BOILER ROOM Important • Never obstruct the ventilation. • Do not store inflammable products in the boiler room. • Avoid storing corrosive products such as paint, solvents, chlorine, salt, soap or other cleaning products near the boiler. A. B. C. D. E. F.
INSTALLATION CONNECTING THE HEATING SYSTEM HOT WATER CONNECTION ACV water kit ACV can supply an optional pre-assembled water kit. This kit comprises: Pressure reducing valve If the mains water pressure exceeds 6 bar, a pressure reducing valve calibrated to 4.5 bar must be installed. Safety group • A pump; • A 3-way manual valve.
230V-50 Hz 6A INSTALLATION N-Mini B Optional accessories Ø 3/4“ Ø 3/4” Expansion vessel 5 litres 6 M Or Br Thermostatic mixer Bk Br Ø 3/4” Pressure reducing valve B Safety group 3 Bk B t ELECTRICAL CONNECTIONS Power supply principle Or 5 t 4 t G The boiler operates on a single-phase supply of 230 V/50 Hz. You should install a control box with main switch and 6A fuses externally to the boiler to allow the boiler to be isolated from the supply for servicing and repairs.
INSTALLATION CONTROL KITS (OPTIONAL) ACV 13 electrical controller • Direct control of the burner (ON/OFF) or modulating control of a power-operated valve. • Domestic hot water priority. Electrical wiring diagram of the wall-mounted case B2. B9. B5. P1. Y1/Y2/N. bl. n/z. br. Temperature sensor Outdoor sensor Analogue/digital room sensor Pump Servomotor (SQK 349 or SSY 319) Blue N Black Y2 Brown Y1 SQK 349 P1 QAD 22 heating outlet sensor • For configuration with an air temperature controller.
INSTALLATION N + NHR INSTALLATION WITH ACV CONTROL 1. 2. 3. 4. 5. 6. Room thermostat Heating pump 3-way power-operated valves Boiler burner NHR 110 L boiler Electrical supply BC 01 or BC 03 1 2 3 5 4 fig. 12 : Installation with two pumps. BC 01 or BC 03 1 5 2 3 4 fig. 13 : Installation with 1 pump and one 3-way power-operated valve.
INSTALLATION Electrical connection of BC 01 with 2 pump 1 3 1 6 2 3 4 5 6 7 8 11 9 4 6 8 7 5 9 10 11 12 13 14 15 16 17 18 19 20 230 V 50Hz t T8 T7 T6 B5 1 T8 T7 T6 B5 5 3 L1 C 2 N T1 T2 S3 4 t Electrical connection of BC 01 with one 3-way motorised mixer valve + 1 pump 1 3 1 6 2 3 4 5 6 7 8 11 9 4 6 8 7 5 9 10 11 12 13 14 15 16 17 18 19 20 230 V 50Hz T8 T7 T6 B5 t 1 T8 T7 T6 B5 5 2 3 L1 C N T1 T2 S3 4 t Connecting the system’s electrical components to th
BURNER CHARACTERISTICS DESCRIPTION OF THE BURNER This new generation of fuel oil burners comply with current requirements in terms of performance and the cleanliness of combustion gases. The burner is fitted with the finest quality components reflecting the latest developments in technology and the fuel-oil is pre-heated. Components: • “Landis & Gyr” relay • “A.E.G.
BURNER CHARACTERISTICS REGULATION PARAMENTER BM R 31 Power Electrical power Nozzle N1 N2 N3 kW 23.0 30.0 49.0 W 150 150 150 gal/h 0.50 0.75 1.25 60° 60° 60° Kg/h 1.94 2.53 4.13 bar 13.5 10.5 10 0.6 0.6 0.6 3 4.5 4 Nozzle angle Fuel oil rate of flow Pump pressure Flue gas index Louver regulation Combustion head regulation Kg Weight 2 1 2 12 12 12 fig. 15 : Combustion head adjuster screw fig. 14 : Electrode distance BURNER DIMENSION BM R 51 fig.
COMMISSIONING MAINTENANCE FILLING THE HEATING CIRCUIT RECOMMENDATION It is compulsory to have the boiler serviced once a year. Boiler servicing and checking must be carried out by a qualified engineer. IMPORTANT If your “N” boiler is connected to an ACV tank, it is essential to fill the domestic water circuit before the heating circuit. 1. Open valves 5 and 8 to fill the heating circuit and make sure the pressure does not exceed 2 bars. 8 8 MAINTAINING THE BOILER 1.
SPARE PARTS N° CASINGS N-MINI N1 N2 N3 A01 Right side 21471387 21471380 21471381 21471382 A02 Left side 21472387 21472380 21472381 21472382 A03 Front panel - 21473380 21473381 21473382 A04 Rear panel 21474387 21474380 21474381 21474382 A05 Top cover 21475387 21475380 21475380 21475382 A06 Unequipped control panel 21477387 21477380 21477380 21477382 A07 Front bridge 21473387 - - - N° ACCESSORIES B01 Unequipped body 30465160 30465153 30465154 30465155 B
SERVICE RECORD DETAILS OF THE INSTALLATION Installation date: Model: % CO2 (max. load) : Serial number: Flue gas T°: Heating system pressure setting: Efficiency: Name and signature: Fuel oil pressure: SERVICE NOTES Installation date: Comments: % CO2 (max. load) : Flue gas T°: Efficiency: Name and signature: Fuel oil pressure: Installation date: Comments: % CO2 (max. load) : Flue gas T°: Efficiency: Name and signature: Fuel oil pressure: Installation date: Comments: % CO2 (max.
excellence in hot water INTERNATIONAL FRANCE SLOVAK REPUBLIC BELGIUM ITALIA ACV ITALIA VIA PANA 92 I-48018 FAENZA (RA) - ITALIA TEL.:+39 0546 64 61 44 FAX:+39 0546 64 61 50 E-MAIL: italia.info@acv-world.com SLOVENIA ACV BELGIUM nv/sa KERKPLEIN, 39 B-1601 RUISBROEK-BELGIUM TEL.: +32 2 334 82 40 FAX: +32 2 334 82 59 E-MAIL: belgium.info@acv-world.com CHILE NEDERLAND ACV NEDERLAND bv POSTBUS 350 NL-2980 AJ RIDDERKERK - NEDERLAND TEL.:+31 180 42 10 55 FAX:+31 180 41 58 02 E-MAIL: nederland.