User guide

QAD 22 heating outlet sensor
8
INSTALLATION
9
INSTALLATION
Electrical wiring diagram of the wall-mounted case
B2. Temperature sensor
B9. Outdoor sensor
B5. Analogue/digital room sensor
P1. Pump
Y1/Y2/N. Servomotor (SQK 349 or SSY 319)
bl. Blue N
n/z. Black Y2
br. Brown Y1
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2
1
bl
bk br
SQK 349
QAAD50
(QAAD70)
QAC32 QAD2
2
P1 B5 B9 B3 B2
P1Y1Y2N B5 B9 B3 B
2
Please contact your installer if you require any further
information.
CONTROL KITS (OPTIONAL)
ACV 13 electrical controller
For configuration with an air
temperature controller.
SSY 319 servomotor
SSY 319 electromechanical
servomotor for 3-way valves.
QAC 32 Outdoor sensor
Wall-mounted case
ACV 13 connecting
wiring case.
SQK 349 servomotor
SQK 349 electromechanical
servomotor for 3-way valves.
Boiler Control BC 01
This control box is used
to connect a single- or
dualfuel boiler to a
heating system boiler,
without hotwater priority.
Boiler Control BC 03
The Boiler Control BC 03 controls a heating system boiler
without domestic hot water priority with a boiler: it controls
the burner operation, the heating pump and the boiler -
either through the SCE pump or the 3-way SCE valve.
The Boiler Control BC 03 incorporates a pump anti-lock
device that regularly starts up the pump for a few seconds
after a long period of non-use.
Direct control of the burner
(ON/OFF) or modulating
control of a power-operated
valve.
Domestic hot water priority.
For configuration with an air
temperature controller.