User's Manual Part 2

4-7
This diagram illustrates how the LGC
ell
is configured. The rest of this section
contains configuration and installation
procedures.
Main Hub Installation
Your installation may have one or more Main Hubs, each located in the same or
different wiring closet. Use the following procedures for all Main Hubs.
1 Mount the Main Hub
Mount the Main Hub to the rack in the
assigned wiring closet location, using four
screws provided.
For air circulation, be sure to
leave at least one inch (25 mm)
space between all hubs and
between any other equipment
in the rack. If mounting a hub on the racks
bottom shelf, also leave at least one inch
(25 mm) clearance from the bottom.
LINK
STATUS
1
2
3
4
DOWN
LINK
STATUS
SYNC
UP
SYNC
POWER
TO EXPANSION HUB PORTS
LGC WIRELESS
LGCell
ª
Main Hub
DOWN
LINK
STATUS
SYNC
UP
DOWN
LINK
STATUS
SYNC
UP
DOWN
SYNC
UP
AC POWER