User's Manual Part 1

LGC
ell
Installation Procedure
This section shows the steps involved in installing an LGCell system.
For a detailed description of LGC
ell
installation procedures, refer to
Section 4, LGCell Installation
.
If you plan to connect your LG
Cell
system to more than one radio or base
station, you also need the
Integration Module Installation and Reference
Manual
.
Install LGCell equipment in the wiring, telecom, or electrical closet(s) indicated on
your site installation plan. LGC Wireless provides the following equipment and
supplies for installation:
LGCell Main Hub(s), each with two rack mount elbow brackets and four rack
mount screws
LGCell Expansion Hub(s), each with two rack mount elbow brackets and four
rack mount screws
Remote Antenna Unit(s) (RAUs) and in-building antenna(s), with four
mounting screws for each RAU
LGCell Installation and Reference Guide
Optionally, Integration Module Installation and Reference Manual
You also need the following equipment and supplies:
Cable and connectors already installed and terminated. LGC Wireless
recommends plenum-rated Category 5 (CAT 5) or better, Unshielded Twisted
Pair or Shielded Twisted Pair (UTP/STP) and Multi-Mode Fiber (MMF) cable.
AC power supply (100-240 VAC at 1.6 A and 50/60 Hz) available for each
Main Hub
19” equipment rack space in the wiring closet
Phillips screwdriver
MMF cleaner recommended by the cable manufacturer
Inspect the equipment and supplies before you start the LGCell installation. Make
sure that the UTP/STP and MMF cables are terminated correctly and that the
connectors are clean and free of dust or oil (use recommended cleaner as necessary).
If you have any problems, call LGC Wireless at 1-800-530-9960 (U.S. customers)
or +1-408-487-2400 (international customers).