User's Manual

PN 8100-40 Help Hot Line (U.S. only): 1-800-530-9960 6-3
620004-0 Rev. B
Managing an LGCell Project
6.1.1 Project Management Responsibilities
Project management functions are performed throughout the duration of the project,
from Site Survey through Commissioning, and include the following:
Lead Project Team
Identify all project participants and document contact information
Initiate project kick-off meeting
Provide coordination of all participants
Provide regular status reports to all participants including the end-user
Define Scope of Project
Obtain system approval from all participants
Define site coverage requirements
Identify critical path items
Identify all special requirements or potential “roadblocks”
Plan installation time requirements
Conduct RF Site Survey
Review/confirm the preliminary signal readings and results of the RF Site Survey,
whether conducted by LGC Wireless or others
Identify RF project changes and/or restrictions
Prepare Site for Installation
Conduct site walk-through with all appropriate participants
Coordinate required permits
Determine material receiving/storage/disbursement location
Engage and contract with the cabling sub-contractor
Schedule material delivery
Coordinate and manage the installation, termination, and testing of required cables
(MMF, UTP/STP, coaxial)
Coordinate with the base station vendor for the integration of the LGCell system
Coordinate with the service provider for frequency allocation
Coordinate the installation of any required AC power, power systems, or power
equipment
Manage Installation of System
Establish and distribute Installation Schedule
Confirm cable installation if provided by third-party company
Confirm antenna locations and selection
Obtain approval of the Installation Plan from primary participants and the end-user
Conduct pre-installation inspection
Coordinate installation of the LGCell equipment
Coordinate installation of antennas