User's Manual
Managing and Planning an LGCell Project
6-4 LGCell 4.0 Installation, Operation, and Reference Manual PN 8100-40
620004-0 Rev. B
Manage System Commissioning
• Coordinate system test
• Coordinate RF signal and coverage tests
• Coordinate complete RF system test with required participants
Manage System Acceptance
• Coordinate final inspection with required participants
• Prepare System Acceptance Document
• Issue System Acceptance Document
• Prepare As-Built Documents