Managing and Planning an LGCell Project
6-6 LGCell 4.0 Installation, Operation, and Reference Manual PN 8100-40
620004-0 Rev. B
Frequency Planning
• Coordinate frequency planning with local carriers
Discuss with the local carrier the channel requirements for the system.
Final System Design
• Complete final design
Generate a final design based on preliminary design, results of RF tests, discus-
sions with all appropriate parties involved in the project, and the site evaluation.
• Create final equipment list
Generate a final equipment requirement list based on the final system design.
• Design review
Discuss the final system design with all appropriate parties involved in the project.
• RF Survey Report
Generate an RF Survey Report documenting all design information that you gath-
ered.
• Traffic analysis of current requirements
Determine capabilities in terms of current and future capacity, coverage, and qual-
ity of service.