User's Manual

PN 8100-40 Help Hot Line (U.S. only): 1-800-530-9960 6-7
620004-0 Rev. B
Planning an LGCell Installation
6.2.1 Site Survey Questionnaire
Project Information End-User Information
Project Name: End-User:
Purchaser Address: Site Address:
Company Name: Contact:
Contact: Phone:
Phone: E-mail:
E-mail:
BTS Information
Type of System Enhancement
Manufacturer:
Coverage Capacity (BTS) Wireless Office Model No:
Building Information
No. of Carriers:
Are floor plans available (including map scale?) Yes No
No. of Subscribers:
Is outdoor coverage required? Yes No
BHCR? Yes No
Erlangs/Sub:
Select the Downlink Power, Frequency, Protocol, and Band to Operate Under
Downlink Power at Mobile (dBm): Select One –65 –70 –75 –80 –85 (default) –90 –95
Frequencies (MHz): Select all that apply 800 900 GSM 900 EGSM 1800 1900
Protocol: GSM TDMA CDMA SMR/iDEN AMPS
Additional Questions
Select One
Are exposed antennas tolerated inside? Yes No Unsure
Are exposed antennas tolerated outside? Yes No Unsure
Are locations above ceiling/closets available for mounting equipment? Yes No Unsure
Have available mounting locations been identified? (please identify on floor plans) Yes No Unsure
Are 19" equipment racks available? Yes No Unsure
Is AC power available at the Main and Expansion Hubs? Yes No Unsure
Are multimode fiber optic cables available? Yes No Unsure
If on a campus, are single-mode fiber optic cables available? Yes No Unsure
Are Cat-5 UTP/STP runs available? Yes No Unsure
If cabling is not available, will customer mandate a subcontractor?
If yes, provide details in “Comments” section below.
Yes No Unsure
Is a bi-directional amplifier (repeater) needed? Yes No Unsure
Comments: (special installation requirements, subcontractors, coverage areas, contacts, etc.)
2540 Junction Avenue | San Jose, CA 95134 | TEL 408-952-2400 | FAX 408-952-2410
Site Survey Questionnaire