User's Manual

Managing and Planning an LGCell Project
6-10 LGCell 4.0 Installation, Operation, and Reference Manual PN 8100-40
620004-0 Rev. B
Prepare As-Built Document
Prepare the final As-Built Document to include the following:
Title Page
Site Address
Contact List
Table of Contents
Introduction
Description of system installation including equipment used, unusual appli-
cations or obstacles, etc.
Equipment Locations
Descriptions or diagrams of equipment locations within the facility
Wiring Configuration and Specifications
Descriptions and tables of MMF and Cat-5 measurements; including Expan-
sion Hub ID numbers, RF signal level readings throughout coverage area,
number of RAUs attached, results of the Cat-5 compliance tests, unusual or
marginal applications, etc.
Base Station Settings
Number of channels and sectors, transceiver setting, etc.
RF power into Main Hub
Amount of attenuation used
Coverage Performance
Description of test method and outcome
Summary
Include outstanding issues, future plans, and future considerations
As-Built Floor Plans