Prepare As-Built Document
Prepare the final As-Built Document to include the following:
• Title Page
• Site Address
• Contact List
• Table of Contents
• Introduction
– Description of system installation including equipment used, unusual appli-
cations or obstacles, etc.
• Equipment Locations
– Descriptions or diagrams of equipment locations within the facility
• Wiring Configuration and Specifications
– Descriptions and tables of MMF and Cat-5 measurements; including Expan-
sion Hub ID numbers, RF signal level readings throughout coverage area,
number of RAUs attached, results of the Cat-5 compliance tests, unusual or
marginal applications, etc.
• Base Station Settings
– Number of channels and sectors, transceiver setting, etc.
– RF power into Main Hub
– Amount of attenuation used
• Coverage Performance
– Description of test method and outcome
• Summary
– Include outstanding issues, future plans, and future considerations
• As-Built Floor Plans