Service manual
23
B. CONTROLS (METER)
TO REPLACE ROTARY METER
1. Discontinue power to dryer.
2. Swing control panel open.
3. Remove two (2) freespin washernuts and dissconnect obstructive wiring. The two (2) freespin washernuts
are located as follows:
One is on top of the meter and the 2nd is on the bottom right hand corner of the meter. Remove wiring
from the meter switches (Note: be sure to check wiring diagram for proper installation of new meter) also
remove the one (1) yellow meter motor wire from the 30 position block.
4. Pull rotary meter out.
5. Reverse procedure to install new rotary meter assembly.
TO REPLACE METER MOTOR
1. Disconnect power to dryer.
2. Swing control panel open.
3. Remove two (2) screws holding meter motor.
4. Remove the yellow wire of the meter motor from switch
“A”. Remove the other yellow meter motor wire from 3 position terminal block.
5. Pull meter motor away and reverse procedure to install new meter motor.
TO REPLACE METER SWITCHES
1. Disconnect power to dryer.
2. Swing control panel open.
3. Disconnect wiring at the meter switches.
NOTE: Be sure to check wiring diagram for correct wiring of switches.
4. Remove two (2) screws holding switches in place.
5. Remove switches.
6. Reverse procedure for installing new switches.










