Service manual

Table Of Contents
UHA LOW PROFILE UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL
28 of 55
10.5 UHA[X][S] Internal Wiring Diagram
IMPORTANT:
For field wiring into service junction box, or if any of the original wire supplied with the heater
must be replaced, it must be replaced with wiring material having a temperature rating of at least 105° C
(221° F) and 600 volts. For supply connections, use No. 14 AWG or larger wires.