Service manual
Table Of Contents
- Installation, Operation & Service Manual
- UHA-Series
- Tubular Unit and Utility Heaters
- (Low Profile Range)
- Manuel d’installation, d’operation, et de service
- UHA-Series
- Aérothermes Utilitaires à échangeur tubulaire
- (Gamme compacte)
- TABLE OF CONTENTS
- SECTION 1: Heater Safety
- SECTION 2: Installer Responsibility
- SECTION 3: Critical Considerations
- SECTION 4: Clearances to Combustibles
- SECTION 5: National Standards and Applicable Codes
- SECTION 6: Heater installation
- SECTION 7: Venting
- 7.2.1 United States Requirements
- 7.2.2 Canadian Requirements
- 7.3.1 Standard Vented Heaters (Models UHA[X] 30 - 125)
- 7.3.2 Separated Combustion Heaters (Models UHA[X]S 30 - 125)
- 7.7.1 Maximum Vent Lengths Table
- 1. Seal any unused openings in the venting system.
- 2. Inspect the venting system for proper size and horizontal pitch, as required by the NFPA 54/ ANSI Z223.1 - latest revision, National Fuel Gas Code (US) or Standard CSA B149.1 Natural Gas and Propane Installation Code (Canada) and these instruction...
- 3. Close all building doors and windows and all doors between the space in which the appliance(s) connected to the venting system are located and other spaces of the building. Turn on clothes dryers and any exhaust fans, such as range hoods and bathr...
- 4. Follow the lighting instructions. Place the appliance being inspected in operation. Adjust thermostat so that the appliance will operate continuously.
- 5. For any appliance having a draft hood, test for draft hood appliance spillage at the draft hood relief opening after five minutes of main burner operation. Use the flame of a match or candle.
- 6. After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas-burning appliances to their previous conditions...
- 7. If improper venting is observed during any of the above tests, the venting system must be corrected by a contractor qualified in the installation and service of gas-fired equipment or your local gas supplier. If the venting must be resized, use ap...
- Figure 9: Vent and Roof Detail
- Figure 10: Standard Vented Heater - Vertical and Horizontal Vent Termination
- Figure 11: Standard Vented Heater - Common Vertical Vent Termination
- Figure 12: Separated Combustion Heater - Vertical and Horizontal Vent Termination
- Figure 13: Concentric Vent Box
- Figure 14: Concentric Vertical and Horizontal Vent Termination - Separated Combustion Heater
- SECTION 8: Air Supply
- SECTION 9: Gas Piping
- SECTION 10: Wiring
- SECTION 11: Operation and Maintenance
- 11.1.1 Louvers
- 11.1.2 Electrical Checks
- 11.1.3 Gas Supply
- 11.1.4 Mechanical Checks
- 11.2.1 Before Operating the Heater
- Figure 16: Automatic Burner Control Sequence
- Figure 17: Gas Valve for Models UHA[X][S] 30 - 45
- Figure 18: Gas Valve for Models UHA[X][S] 60 - 125
- 11.2.2 Start-Up the Gas Valve (All Gases)
- 11.2.2.1 Check Burner Gas Pressure
- 1. Remove the plug in the outlet (burner) pressure test point and connect a pressure tap and a manometer.
- 2. With the burner firing, measure the pressure on the manometer. To adjust the burner pressure, remove the regulator cover from the valve and turn the regulator adjustment screw to set the required burner pressure as stated in the Technical Data Tab...
- 11.2.2.2 Check Gas Rate
- 1. After burner pressure adjustment, allow the heater to operate for at least 15 minutes and then re-check settings. Adjust pressure setting if necessary.
- 2. Check gas flow rate at gas meter.
- 3. Turn off heater and electrical supply.
- 4. Remove the manometer and refit all covers to the valve and tighten the screw of the outlet pressure tap.
- 11.2.2.1 Check Burner Gas Pressure
- 11.2.2 Start-Up the Gas Valve (All Gases)
- SECTION 12: User Instructions
- SECTION 13: Servicing
- 1. Open the hinged door and remove from the hinges. Set door aside. See Page 46, Section 15.2.
- 2. Remove burner side panel. Electrode and flame probe should remain attached. See Page 47, Section 15.3.
- 3. Remove burner assembly from cabinet via four screws, two on top and two on bottom. Clean any deposits from the main burner which may have formed in the injectors or venturi of the burner.
- 4. Check condition of ignition electrode and flame probe. Clean off any deposits which may have formed, check condition of ceramic insulators. Replace as required. See Page 47, Section 15.3.
- SECTION 14: Troubleshooting
- SECTION 15: Replacement Parts
- See warnings and important information on Page 37, Section 13 before removing or replacing parts.
- Burner Components All serviceable burner parts are accessed by the hinged door on the side of the heater.
- 15.1 Gas Valve
- 15.2 Burner Injectors
- 15.3 Ignition Electrode and Flame Probe
- 15.4 Heat Exchanger
- 15.5 Louver and Louver Springs
- 15.6 Flue Blower Vertical Installation
- 15.7 Pressure Switch
- Pull off 3 way connector. Spring open plastic clips of mounting cradle. Replace with correct type of pressure switch for model. The pressure switches are color coded for each pressure setting. Carry out a start-up after working on or changing a press...
- The control mounts to the heat exchanger plate. Pull out ignition cable and wiring from board, noting their positions. Release the four mounting standoffs. Refit in reverse. Ensure correct location of ignition cable and all other wiring.
- The axial fan unit for the heater is supplied completely assembled and balanced.
- SECTION 16: Specifications
- SECTION 17: ADDISON® UHA-Series Warranty

UHA LOW PROFILE UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL
38 of 55
front tubes which may indicate burner over firing or
persistently low air flows.
13.5 Gas Valve Maintenance
No regular maintenance is required on this device.
To change gas control valves,
See Page 45, Section
15.1.
Do not repair or disassemble gas valve.
Replace faulty gas valves with replacement parts
sold and supplied by Addison.
13.6 Flue Blower
The flue blower should not require maintenance.
However, if the air pressure switch is causing burner
lockout, then remove the flue blower from the vent
box by unscrewing the screws at the mounting plate.
Screw quantity will vary by model size. Remove the
screws attaching the mounting plate to the fan inlet.
See Page 49, Section 15.6. Ensure that the fan is
free to run and that the fan wheel is clean.
13.7 Venting and Air Intake Pipe
Inspect all venting and air intake pipe. Ensure that
all seams are sealed and suspension points secure.
Repair suspension points if any part of the venting
or combustion air pipe is sagging. Check to make
sure any insulation is not missing or in poor
condition. Replace as necessary. Check all venting
and air intake components to ensure they are in
good condition, gas tight and corrosion-free.
13.8 Maintenance Checklist
Installation Code and Annual Inspections: All
installations and service of ADDISON
®
equipment
must be performed by a contractor qualified in the
installation and service equipment sold and supplied
by Addison and conform to all requirements set forth
in the ADDISON
®
manuals and all applicable
governmental authorities pertaining to the
installation, service, operation and labeling of the
equipment.
To help facilitate optimum performance and safety,
Addison recommends that a qualified contractor
conduct, at a minimum, annual inspections of your
ADDISON
®
equipment and perform service where
necessary, using only replacement parts sold and
supplied by Addison.
Annual Fall Start Up Follow entire start-up procedure at this time and check control settings and
operation.
The Vicinity of the Heater Do not store or use flammable objects, liquids or vapors near the heater.
Immediately remove these items if they are present.
See Page 6, Section 3.
Vehicles and Other
Objects
Maintain the clearances to combustibles.
Do not hang anything from, or place anything on, the heater.
Make sure nothing is lodged in between the heat exchanger or in the louvers.
Immediately remove objects in violation of the clearances to combustibles.
See Page 7, Section 4.
Vent Pipe/Terminals Venting must be intact. Using a flashlight, look for obstructions, cracks on the
pipe, gaps in the sealed areas or corrosion.
The area must be free of dirt and dust.
Remove any carbon deposits or scale using a wire brush.
If the vent terminal has a screen built in, remove any dirt, dust or deposits
from the screen.
See Page 15, Section 7 through Page 22, Section 8.
Cabinet Exterior After installation, touch up scratches. Periodic painting should be done there-
after as required. Warning labels and logo labels should be legible and accu-
rate. Please contact Addison or ADDISON
®
independent distributor if you
need replacement warning labels or logo labels.
See Page 2, Figure 1 through Page 4, Figure 3.