Manual

Initialization & Installation 25
Initialization Wiring
Figure 2-1 Layout for Initialization the NuDAM module
2.3 Install a New NuDAM to a Existing Network
Equipments for Install a New Module
A existing NuDAM network
New NuDAM modules
Power supply (+10 to +30 V
DC
)
Installing Procedures
1. Configure the new NuDAM module according to the initialization
procedures in section 2.2.
2. The baud rate and check-sum status of the new module must be
identity with the existing RS-485 network. The address ID must not
be conflict with other NuDAM modules on the network.
3. Power off the NuDAM power supply of the existing RS-485
network.
4. Power off the host computer.
5. Wire the power lines for the new NuDAM with the existing network.
Be careful about the signal polarity as wiring.
6. Wire the RS-485 data lines for the new NuDAM with the existing
network. Be careful about the signal polarity as wiring.
7. Wire to the input or output devices. Refer to section 2.4 for
illustrations.
8. Power on the host computer.
9. Power on the NuDAM local power supply.
10. Use the NuDAM administration utility to check entire network.
Host
Computer
DATA +
DATA -
DATA+
DATA -
Default*
Local Power Supply
+10 V to +30 V
New
NuDAM
module
NuDAM-6520
RS-232/RS-485
Converter
RS-232
+Vs GND +Vs GND
+Vs GND