User's Manual
AdvancedRFTechnologies,Inc. 55
7. COMMISSIONING
Thecommissioningprocessiscomposedofthefollowing:
‐ Pre‐CommissioningCheck(refertosection7.1)
‐ OpticCommissioning(Opticlosscompensation)(refertosection7.2.1)
‐ HEcommissioning(refertosection7.2.2)
‐ RUcommissioning(refertosection0)
‐ Commissioningverification(refertosection0)
7.1
Pre‐CommissioningCheck
7.1.1 Verifycableconnections
Beforepoweringupunits,checkallRFcables,fibercables,andpowercablesconnections.
AllpowerLEDsshouldbelit1minuteafterthecomponentshavebeenturnedon.
CheckwhetherLD&PDLEDsofHEODUmodulesaresolid
GREEN.(PDLEDwillbelitgreenwhenconnectedto
aMasterRU).
‐ If the PD LED for the link with a connection with to a HPR is OFF, then check the optic cable
connection.
‐ IftheopticcableisgoodandthePDLEDis notlit
green,thetryanotheropticportontheADX‐
RACK‐ODUtoseeiftheotherportlightsupgreen.
7.1.2 ConnecttotheWeb‐GUI
ConfirmthattheNMSHost/RemoteswitchissettotheHostposition
ConfirmthattheHEView/RUViewswitchissettothe
HEViewposition
ConnecttheRJ‐45crossovercablefromtheEthernetportofNMStotheEthernetportoflaptop
Launch a standard Internet browser like IE or Google Chrome and type the System Controller’s IP address
(192.168.63.1)intotheaddessbar
Ontheloginscreen
usethefollowingdefaultlogin/passwordtogainaccess:
‐ Username:adrf
‐ Password:adrf
Figure7‐1 Loginwindow