User's Manual

AdvancedRFTechnologies,Inc.  64
7.2.2.1.3 HEBCUCommissioning
When performing BCU commissioning, the user will need to enter the DL input commissioning level and
Targeted DL Output Power Ratio for eachRFpath.Refer to section 7.2.2.1 to calculateDL inputcommissioning
level.Ifaportisnotbeingused,theDLInputCommissioningLevel
shouldbesetto“disabled”.
7.2.2.1.3.1 HEBCUCommissioningProcedure
GotoInstallpageoftheBCUontheWebGUI
Figure76 BCUInstallWindow
SelectaDLInputCommissioningLevelforeachRFpath
DLInputCommissioningLevelsrangeis0~+25dBm(0.5dBstep)
EnterHEBCUdownlinkoutputpowerratioforeachport
Pressthe“Apply”button
TheattenuationvalueandoutputALClevelforeachDL/ULpathwillbesetautomaticallybasedontheHEBCU
downlinkinputcommissioninglevelanddownlinkoutputpowerratioforeachport.
The
BCUwillchecktoseeifALCisactiveonanyoftheports.
Duringthecommissioningroutine, if ALCisactivated,a popup messagewillappearstatingthat
ALC is running.If thisis the case, then thereis a chance thatthe “backoff”value needs to
be
increasetoallowmorebreathingroom.
TheBCUcheckstoseeiftheBCUhasanyalarms.
If a soft fail is present, the system will prompt the user whether or not they would like to
continue.
Ifhardfailispresent,thecommissioningprocesswillstop
immediately.