User's Manual Part 3
Advanced RF Technologies, Inc.
97
8.2.4.2.1 RFU Commissioning
This section allows the user to perform RFU commission. To perform RFU commissioning, select a DL Input
Commissioning Level from the dropdown menu and click Apply. The commissioning progress is displayed on the
Commissioning Progress bar. Any errors, warnings, and messages will appear via a popup window. Please refer to
the ADX Installation Guide to determine the proper RFU commissioning levels.
Figure 8-70 RFU Commissioning (Install – RFU)
8.2.4.2.2 Description
This section allows the user to set the description of RFU.
Figure 8-71 Description (Install – RFU)
8.2.4.3 Install – OPT
Figure 8-72 Install – OPT
8.2.4.3.1 Optic Commissioning
This section will allow the user to perform any optic compensation if it is necessary. The Commissioning
button will turn orange if optic compensation is needed.