User's Manual

Advanced RF Technologies, Inc.
42
Pollution degree (PD)
PD2
6.2 ADXV DAS Installation Procedure
6.2.1 HE Installation Procedure
CAUTION: ADXV DAS HE should be installed inside building only.
6.2.1.1 Installing a ADXV DAS HE in a rack
The ADXV HE chassis mounts in a standard 19” (483mm) equipment rack. Allow clearance of 3” (76mm) at the
front and rear, and 2” (51mm) on both sides for air circulation. No top or bottom clearance is required.
Consideration:
- Eight mounting holes are located on 4 corners of ADXV HE to attach it to the 19” rack. The ADXV
HE must be securely attached to a rack that can support the weight of the ADX.
Mount procedure
- The following steps should be followed while mounting the ADXV HE
Verify that the HE and Mounting holes are in good condition
Set the ADXV DAS HE against the 19”rack and secure the unit with screws
Verify that ADXV HE is securely attached
Connect the GND cable
Connect the RF cable
Connect the Power
Connect the Optic cable