Manual

7-1
C H A P T E R 7
Monitor Installation
After installing the sensors and establishing communications, install
the IETG FlowHawk
monitor in the manhole. The monitor
mounts inside the manhole by a mounting bracket attached to the
monitor and bolted to the manhole wall or using a hook attached to
a manhole rung. The following procedures for monitor installation
apply to most sites. However, because manholes differ in many
ways, some sites may require the installer to implement slight
modifications to the standard installation technique.
Before installing the monitor at the site, activate the monitor to
verify that the monitor is configured correctly for the application
and that the battery pack is operating at an adequate voltage. Make
any necessary changes to the configuration before mounting the
unit. Refer to Chapter 8, Maintenance and Troubleshooting, for
information on replacing the battery pack, when necessary.
Note: Manhole and sewer system work involves confined
space entry and is inherently dangerous. Therefore,
installers and technicians must comply with all local and
federal regulations concerning confined space entry. IETG
is not responsible for any injuries, damages, claims, or
liability resulting directly or indirectly from the use of this
installation guide or the installation of any IETG
equipment.