3  COMMISSIONING 
The power supply connection and interfaces of this device are installed at the side of case. 
All  supply  leads  and  all  required  data  leads  have  to  be  connected  before  starting 
commissioning. 
Warning: 
The device must be switched off before connecting or disconnecting any cables in 
order to prevent damage to the electronics! 
The device may only be switched on after acclimatising to the ambient temperature 
in order to avoid condensate accumulation. Make sure to meet the permissible 
voltage requirements for this device. 
After switching off and before switching on you must wait for at least 10 seconds. 
Note: 
The screen of a data cable must always be connected with the connector housing 
(EMC). 
Under the embedded operating system, interfaces must explicitly be enabled and 
required drivers must be installed in order to be able to use them. 
3.1  AVAILABLE INTERFACES 