PROCEDURE
FOLLOW-UP PROCEDURES
All applicable modules, SCU and the required STS-1 MUX modules, have been installed.
Follow-up procedures should be observed in accordance with CO SOP.
Perform the Steps Below in the Order Listed: For details, refer to:
1. Install Modules in MX2820 Shelf:
• Unpack, inspect, and install the primary MUX Module.
• Unpack, inspect, and install the protect MUX Module, if required.
• Install front panel blanks in vacant slots.
DLP-505
2. Provision the STS-1 network. DLP-741
3. Provision the VT/Port (T1/E1) interface. DLP-742
4. Provision STS-1 MUX protection. DLP-738
5. Provision STS-1 MUX loopback timeout. DLP-739
6. Perform acceptance testing for STS-1 MUX Modules. DLP-602