Troubleshooting guide
61186003L1-1D 7-41
DLP-601
MX2820 Acceptance Test Procedure
INTRODUCTION
This procedure provides step-by-step instructions to verify that one or more MX2820 shelves
are properly installed in a Central Office (CO). An Acceptance Test Checklist is provided at the
end of this procedure for sign-off after completing this phase of the installation.
PREREQUISITE PROCEDURES
The following procedure must be completed before provisioning the SCU. If necessary, refer to
the appropriate documentation before proceeding.
• “NTP-002, M13 MUX Installation”
• “NTP-004, STS-1 MUX Installation”
TOOLS REQUIRED
• A computer with Local Area Network (LAN) access if the MX2820 system is connected to a
LAN
WARNING
To prevent electrical shock, do not install equipment in a wet loca-
tion or during a lightning storm.
CAUTION
Electronic modules can be damaged by static electrical discharge.
Before handling modules, wear an antistatic discharge wrist strap
to prevent damage to electronic components. Place modules in
antistatic packing material when transporting or storing. When
working on modules, always place them on an approved antistatic
mat that is electrically grounded.