Owner's manual

1
CP000 Installation Instructions
P/D 022597
ADVANCED CONTROL TECHNOLOGIES, INC.
Indianapolis, Indiana 46278
PCC 120/277 VAC 1:1 Ratio Passive Coupler
BEFORE YOU BEGIN...
READ ALL INSTRUCTIONS
Make sure your installation will conform to all applicable codes and requirements.
TEST FOR SIGNAL STRENGTH AND NOISE...
using the AR300 and AT300. It is necessary to test the installation in the actual operating
environment. The amount and types of line loads may reduce the strength of the transmitted signal
and/or electrical noise may cause interference with the transmitted signal. Proper installation may
require additional couplers, filters or repeaters. Special coupling devices are required to allow signal
to be distributed to all phases and zero-crossings in multi-phase and multi-transformer distributions.
IF YOU HAVE ANY QUESTIONS...
Consult your nearest Engineered System Center (ESC) for additional information.
There are no field repairable assemblies on this unit. It is covered by a two year limited warranty.
If service is needed, the unit must be returned to the ESC where purchased. Contact your ESC for
return details.
INSTALLATION
CAUTION! Make all connections with the POWER OFF to avoid injury to the installer or damage
to the device.
NOTE! The CP000 is designed to transfer command signals generated on one phase of a three
CP000

Summary of content (2 pages)