Installation Guide

4640 TRUEMAN BLVD. HILLIARD, OH 43026 (800) 821-6710 www.ads-pipe.com 3
A
IG102 © ADS 2008
Figure 1
Typical Backfill Structure
Alternate Backfill Methods – Shaped Trench Bottoms
Shaped trench bottoms may be used in lieu of the standard trench detail shown in Figure 1, provided a free
flowing pea gravel or small rock chips are used to fill in the resultant void areas. Pea gravel or small chips
shall be clean material passing a 3/8 inch (9.5mm) sieve meeting the class I, II, or III requirements of ASTM
D 2321. This applies only
to those insitu soil conditions where the native soil can be cut to a stable shaped
trench. Line and grade may be affected due to the use of a modified trench bottom which may affect the pipe
hydraulics.
Figure 2
Shaped Trench Bottoms
Buyer/user is responsible for serviceability of the product in any given application. Seller is not responsible for injury or damage resulting from
improper installation, noncompliance with guidelines for installation of product, or use outside the guidelines set forth herein.
2(c)
Circular Bottom
8”-24” Pipe
2(a)
“V” Groove
4”-8” Pipe
2(b)
Trapezoidal Bottom
8”-24” Pipe