Owner's Manual

5
INSTALLATION
Fig 6
Fig 7
Side view
Locate a position that is:
Minimum 2 inch of
clearance below the
roof/eave/overhang.
At least 10 inch of ver-
tical clear space.
Minimum depth of
31 inches.
The Door Awning needs
to be mounted to the
main structural supports
of the building.
The surface of the area
should be clear of any
obstructions along the
entirety of the Door
Awning.
DETERMINE THE
DOOR AWNING
LOCATION
www.advaning.com Toll Free (US): (855) 574-0158
Roof, eave or overhang
Roof, eave or overhang
31 inches
Minimum 2 inch
Ground, oor or deck
Minimum 10 inch
clear space
B
Minimum 10 inch clear space
A
Minimum 2 inch
A
B
C
C