Installation Guide

9
INSTALLATION
www.advaning.com Toll Free (US): (855) 574-0158
Fig 20
Fig 18 Fig 19
Fig 17
Follow instructions for
standard installation
step 1 and 2 (page 7).
Use the recommended
bracket location
chart (page 5) to nd
bracket location for
your awning model
along the line.
Align the top of the
bracket to the chalk
line and use a level to
make sure the bracket
is straight.
Mark the center of
the bracket mounting
holes.
Drill mounting holes
using a masonry drill
bit.
Wall
3.5”
Bracket
Center
Bracket locations base
on your awning model
Marker/pencil
2
3 4
5
3
4
5
1
2