Instruction manual

Maximum Series Portable Chiller : Air & Water-Cooled : M1 Series Instrument
Page: 15
ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
Email: service@AdvantageEngineering.com
condenser coil if the panels are not in place. Starting the
unit without all the enclosure panels in place will result in a
high pressure refrigerant fault.
5. Units with a motor-driven fan may not use duct work unless
a booster fan of equal volume rating has been installed in
the duct.
2.3 TO AND FROM PROCESS CONNECTIONS
A. Useappropriatelyratedhoseoruidpipingto
connect the process piping going to your
process to the “to process” connection on the
chiller.
B. Useappropriatelyratedhoseoruidpiping
to connect the process piping coming back
from your process to the “from process”
connection on the chiller.
C. Install a high volume basket strainer in the
From Process line with isolation valves. A
basketstrainerorbaglterwithameshscreen
of 20-40 microns will protect the unit. A “wye”
type strainer is not recommended because
it does not have adequate debris holding
capacity.
D. Process water piping should be designed to avoid excessive elbows
and/orlengthsofpipeorhose.Ifusingexiblehoseavoidtight
twists or curls and excessive lengths.
E. Valvesandltersmaybeinstalledintheprocesswaterpiping
to facilitate service and maintenance provided that such devices
maintain the full inside diameter of the process connection. If
From Process
Make-Up Water Supply
To Process
To Process
From Process
Condenser Water Out
Make-Up Water Supply
Condenser Water In
From ProcessTo Process
This label marks the
To Process connection
From Process
This label marks the From
Process connection
Typical wye strainer -
Not recommended.