F. Condenser Air Filtering.Usealterthatproducesverylowair
owrestrictions.Generallyadisposableberglasslterwitha
MERVratingof2-3providesadequateairltration.Thepurpose
ofthelteristopreventlargeparticlessuchasdust,lintanddebris
from fouling the condenser. You should be able to see through
theltermedia.Usingrestrictiveltermediacancauselossof
chillercapacity,difcultyrunninginwarmweatherandfanmotor
overheating.
2.6 WATER-COOLED CONDENSER
A. Connect the facility cooling tower or city water supply to the
“condenser water in” connection on the unit.
1. Requiredowratefromacitywater
source is 1.5 gpm at 65°F per ton of
rated capacity.
2. Requiredowrateforatowerwater
source is 3 gpm at 85°F per ton of rated capacity.
B. Connect the facility tower system return or drain to the “condenser
water out” connection on the unit.
1. Note: Follow all local codes if
dumpingtotheplant’ssanitaryor
other drain.
C. The pressure differential requirement between the condenser “water
in” and the condenser “water out” lines must be 30 psi.
WARNING: Do not attempt to start or operate an air-cooled portable chiller
without all cabinetry panels in place. Air-cooled chillers require air to be drawn
through the air-cooled condenser. This will not occur if the panels are not in place.
From ProcessTo Process
Condenser
Water In
This label marks the
Condenser Water In
connection
From ProcessTo Process
Condenser
Water In
Condenser
Water Out
This label marks the
Condenser Water Out
connection
Typical Filter materials.