Instruction manual
Maximum Series Portable Chiller : Air & Water-Cooled : M1 Series Instrument
Page: 19
ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, Indiana 46142
317-887-0729 Fax: 317-881-1277
Service Department Fax: 317-885-8683
Email: service@AdvantageEngineering.com
D. The installation of a strainer in the condenser “water in” line is
recommended. This removes solids from the water supply and
serves to protect the water saver (regulator) valve.
E. Thewaterregulatorvalve(gure
2.5A) is normally factory set for
properoperation.Wheneld
adjustments are required, turn
the adjusting nut on the top of the
valve counter clockwise to raise the
refrigerant pressure and clockwise
to lower the pressure. Adjustments
should be made only when the
chiller is running at full load.
2.7 ELECTRICAL CONNECTION
A. STANDARD MODELS
1. All electrical wiring must comply with local codes and the
National Electric Code.
2. Electrical power supply requirements for standard units
areidentiedontheequipmentdatatag.Determinethat
theplant’svoltagesupplyisthesameastheunit’svoltage
requirements, taking into account the SSCR Rating.
3. A customer supplied, four conductor cable is required for
connection to a customer supplied fused disconnecting
means. The fused disconnecting means shall be sized and
installedaccordingtotheunit’spowersupplyrequirements
and local electrical codes. (Some custom units may include
a fused or non-fused disconnect switch.)
4. Connect the four conductor power cable to the power entry
terminalblockontheunit’selectricalpanel.Thenconnect
the power cable to the fused disconnect switch. There is no
Figure 2.5A
Typical water saver regulator
valve.
WARNING: Do not connect the unit to a voltage supply not equal to the unit’s
voltage requirements as specied on the unit’s data plate. Use of incorrect voltage
will void the unit’s warranty and cause a signicant hazard that may result in
serious personal injury and unit damage.
WARNING: Electric Shock Hazard. High Voltage is present in the electrical
cabinet. Disconnect power before servicing. Follow all facility lock-out tag-out
procedures.










