Operating Instructions
Table Of Contents
- 1. Introduction
- 2. Technical customer support
- 3. Functional description
- 4. Unpacking, transporting, storing
- 5. Technical data – Device
- 6. Technical data – Radio modules (all optional)
- 7. Operation
- 8. General device configuration
- 9. Wi-Fi configuration
- 10. WWAN configuration
- 11. Mechanical installation
- 12. Electrical installation, cable connection, cable cover
- 13. Connectors
- 14. Integrated power supply, power supply cable
- 15. Optional equipment
- 16. Maintenance
- 17. Malfunctions and troubleshooting
- 18. Reasonably foreseeable misuse
- 19. Guidelines and certificates
- 20. End-of-life device disposal
- 21. List of figures
WWAN configuration
DLT-V72 Operating Instructions V2.50 Preliminary 91 / 140
Do not enter a user name or password.
Click Dial.
The test connection is established.
Fig. 10.20: QUECTEL EC25 - Dial Vodafone test connection
In the Network and activation center of the device, the status of the test connection can be tested:
Right-click the network and then select Status.
Fig. 10.21: QUECTEL EC25 - Function test GSM / GNSS, test connection status