Operating Instructions

Table Of Contents
Electrical installation, cable connection, cable cover
DLT-V72 Operating Instructions V2.50 Preliminary 105 / 140
12.3.2. Securing the ground using ring tongue to the ground bolt
Fig. 12.3: Ring tongue secured to the ground bolt
Secure the ring tongue of the power supply cable
to the ground bolt.
ATTENTION For correct grounding, it is important
to have the correct order of the components on the
ground bolt (from inside to outside):
1. Toothed washer (internal).
2. Ring tongue of the power supply cable (flat
side faces the DLT-V72 connector panel).
3. Tightening the nut hand-tight.
1
2
3