Quaestor-SZU Releasing Fire Control Panel - Installation and Operation Manual
Revision E03.04
18 of 155
This section provides instructions for connecting cables, mounting and testing the Quaestor-SZU Releasing
Fire Control Panel for installation.
Install this product in accordance with NFPA 72, the National Electrical Code and all local codes.
General Installation Checklist
To complete the installation:
1 Create a plan for the fire alarm system and provide a checklist for installing the fire control panel.
2 Identify the operating constraints of the fire alarm system and then determine the battery capacity of the
fire control panel.
3 Check the contents of the shipping package containing the Quaestor-SZU Releasing Fire Control Panel.
4 Remove the cabinet-door of the Quaestor-SZU Releasing Fire Control Panel.
5 Remove the fascia from the cabinet-box of the Quaestor-SZU Releasing Fire Control Panel.
6 Remove the standby-batteries from the base of the cabinet-box.
7 Mark the location for anchoring the cabinet-box to the premises-wall.
8 Mount the cabinet-box of the fire control panel to the premises-wall.
9 Feed, secure and connect cabling for AC power and field terminals.
10 Replace the standby-batteries in the base of the cabinet-box.
11 Reattach the fascia to the cabinet-box of the Quaestor-SZU Releasing Fire Control Panel.
12 Reattach the cabinet-door to the cabinet-box.
13 Connect the standby-batteries to the Quaestor-SZU Releasing Fire Control Panel.
14 Apply AC power from the main AC power source.
15 Test the Quaestor-SZU Releasing Fire Control Panel installation.
Section 3
Installation