Installation guide

UPS 40-160 kVA, 400 V 50/60 Hz output
Users and Installation Guide
1023294
Revision C
58
6. Route input and output cables through wire way to the terminals of the cabinet.
7. System output cables (L1, L2, L3, and N) should be connected to copper bars either top
or bottom of the cabinet.
8. System input cables (L1, L2, L3, and N) should be connected next to the fuses: S11, S21,
S31.
9. PE cables should be connected to terminal X1 at the bottom of the cabinet.
10. Place the metal plates to correct positions and fix the switches S11-S31 to their correct
position.
11. Close the door and secure with a latch.
Dimensions
Weight of the Tie cabinet is 217 kg.
Figure 39. Dimensionsofthe120/160kVATiecabinet