Operation Manual

perform the function: Steam Cleaning
Plus.
You can enable / disable the function:
Cleaning Reminder in the menu: Basic
Settings.
12.6 Cleaning the water
drawer
Remove the water drawer from the
appliance.
1. Remove the lid of the water drawer.
Lift the cover in correspondence with
the protrusion in the rear.
XAM
2. Remove the wave-breaker. Pull it
away from the drawer body until it
snaps out.
3. Wash the water drawer parts with
your hands. Use tap water and soap.
Do not use abrasive
sponges. Do not put
water drawer inside a
dish washer.
After you clean the water drawer parts,
reassemble the water drawer.
1. Snap in the wave-breaker. Push it
into the drawer body.
2. Assemble the lid. First insert the front
snap and then push it against the
drawer body.
XAM
XAM
3. Insert the water drawer inside the
appliance.
4. Push the water drawer towards the
oven until it latches.
12.7 Steam generation system
- Descaling
When the steam generator operates,
there is an accumulation and deposition
of limestone inside because of calcium
contents in the water. This can have a
negative effect on the steam quality, on
the performance of the steam generator
and on the food quality. To prevent this,
clean the steam generation circuit from
residual stone.
Remove all accessories.
Select the function from the menu:
Cleaning. The user interface will guide
you through the procedure.
The duration of the complete procedure
is about 2 hours.
The light in this function is off.
1. Put the grill- / roasting pan on the
first shelf position.
2. Put 250 ml of the descaling agent in
the water drawer.
3. Fill the remaining part of the water
drawer with water to the maximum
level.
4. Fit the water drawer in the appliance.
5. Activate the procedure
The duration of this part is
around 1 hour 40 minutes.
6. After the end of the first part, empty
the grill- / roasting pan and put it on
the first shelf position again.
7. Fill the water drawer with fresh water.
Make sure there is no remaining
cleaning solution inside the water
drawer.
8. Fit the water drawer in the appliance.
9. Activate the second part of the
procedure to rinse the steam
generation circuit.
The duration of this part is
around 35 minutes.
Remove the grill- / roasting pan after the
end of the procedure.
ENGLISH
61