Operating instructions
Table Of Contents
- 1 Notes on these Operating Instructions
- 2 General Information
- 3 Safety
- 4 Set-Up and Operation
- 5 Commissioning
- 6 Electrical Start-Up
- 7 Interfaces and communication
- 8 Signalling and Error Correction
- 9 Parallel operation
- 10 Maintenance
- 11 Storage, Dismantling and Disposal
- 12 Glossary

27
EN
Comments:
1. Connectors for mains input and output, additional
connectors for setting single and parallel operation
2. Manual bypass switch
3. Mains input circuit breaker
4. Connection for external battery module
5. Connector for parallel operation
6. Communication slot for optional expansion cards,
e.g. SNMP, USB, AS/400, …
7. Communication interface RS232
(9-pin SUB-D socket)
8. Vent (Attention: at least 10 cm of free area are
required behind the vent for free ventilation!)