OPERATION MANUAL Gas Cooktop CGA 60 WOK, CGA 75 WOK, CGA 90 WOK COD. 208196 - REV 2 - 07.06.
Congratulations on the purchase of your AEG appliance. We are sure it will provide many years of great cooking experience. You may find that it has different features and characteristics to your last appliance. It is essential you read this operation manual thoroughly to fully understand all of the various functions and operations. Experiment with your cooking and take advantage of the features your new appliance offers. This manual should be retained for future reference.
A- Installation check and warnings We invite you to read this instruction booklet carefully, before installing and using the equipment. If this equipment should be sold or transferred to another person, please ensure that the new user receives this booklet.
B- Cooking Instructions NOTE: Automatic start-up without valves Turn the corresponding knob anti-clockwise up to the maximum position (large flame, Fig. 1) and press start-up button P(fig. 1). When the equipment is switch off, always check that the knobs are in the closing position. If the flame should blow out accidentally, the safety valve will automatically stop the gas supply, after a few seconds. To restore operation, set the knob to the lighting point (large flame, fig. 1) and press.
C- Cleaning WARNING: – Before any operation, disconnect the appliance from the electric grid. – Do not clean the appliance while it is hot. Burners and racks These parts can be removed to make cleaning easier. The burners must be washed with a sponge and soapy water or with a light detergent, wiped well and placed in their housing perfectly. After cleaning, check that the feeler of the safety valve, start-up electrode and the flame-dividing ducts are not clogged with soap or grime.
D- Installation & Warnings with a cross section of at least 200cm2, and the higher air exiting with a cross section of at least 60 cm2. NOTE: THE OPERATIONS INDICATED BELOW MUST BE FOLLOWED BY QUALIFIED PERSONNEL EXCLUSIVELY, IN CONFORMITY WITH THE REGULATIONS IN FORCE. THE MANUFACTURING FIRM REFUSES ALL RESPONSIBILITY FOR DAMAGES TO PEOPLE, ANIMALS OR OBJECTS, RESULTING FROM THE FAILURE TO COMPLY WITH SUCH PROVISIONS.
D- Installation & Warnings GAS TRANSFORMATIONS AND ADJUSTMENTS MAINTENANCE Lubricating the taps In the case of tap hardening, it is necessary to disassemble the tap and grease it. – Unscrew the two screws that lock the head flange of the tap. – Lift the gas adjusting cone and carefully clean it with gasoline or diluent. – Spread a little high-temperature grease on it, making sure that the gas holes are not obstructed. – Reassemble all of the parts with care.
1 2 3 4 5 6A 7 6 8 10 9 8 10/A
E- Technical Diagrams CGA 60 WOK CGA 75 WOK CGA 90 WOK F- Technical Characteristics Table BURNERS N° DESCRIPTION 1 RAPID 2 SEMI-RAPID 3 AUXILIARY 4 WOK GAS NORMAL PRESSURE INJECTOR DIAMETER TAPE BY PASS DIAMETER NOMINAL HEAT INPUT MAX. mbar 1/100 mm 1/100 mm MJ/h (Btu/h) PROPANE 28 92 42 NATURAL 10 155 REG. PROPANE 28 72 31 NATURAL 10 120 REG. PROPANE 28 55 27 NATURAL 10 90 REG. PROPANE 28 107 60 NATURAL 10 175 REG. 11.6 (11000) 6.3 (6000) 3.
E- Technical Diagrams CGA 60 WOK CGA 75 WOK CGA 90 WOK POWER (MJ/h) POWER (Btu/h) 1 Rapid burner 11.6 11000 2 Semi-rapid burner 6.3 6000 3 Auxiliary burner 3.2 3000 4 Triple ring burner 17.
G- Warranty AEG products are designed and built to the highest standards. We expect your appliances to provide many years of trouble free enjoyment. In the event of an appliance requiring attention, each appliance is covered by a 2 year warranty from the date of purchase. Refer to warranty policy for complete terms and conditions. Coverage is for costs of parts and labor for appliances in capital cities & metropolitan areas.
AEG Unit 20, 2150 Winston Park Drive, Oakville,Ontario, Canada L6H5V1 Tel 905-829.3980 Fax 905-829.3985 email: marketing@euro-line-appliances.com For Service & Spares: EURO-PARTS 1-800.