Operating Instructions and Installation Instructions
22
Installation - for contractors
!
26_02_02_0948
» Seal and insert the twin connectors.
!
!
D0000041896
» Break out the cable grommet knock-out in the
back panel. Deburr the sharp edges with a le if
necessary.
D0000041897
» Push the back panel over the threaded stud and the
cable grommet. Pull the cable grommet by the lock-
ing hooks into the back panel using pliers, until both
locking hooks audibly click into place.
» Remove the transport plugs from the water
connections.
» Press the back panel rmly into place and lock the
xing toggle by turning it clockwise through 90°.
D0000041925
» Screw the water connection pipes with at gaskets
on to the twin connectors.
!
-
tion.
»
-
WARNING Electrocution
WARNING Electrocution
The connection to the power supply must be in the
-
WARNING Electrocution
!
» Connect the power cable to the mains terminal (see
chapter "Specication / Wiring diagram").
3
L
3’
4
L
2’
1
L
1’
2
L
L
L
NT C
T- sol
l
X11
26_02_02_1348