Operating instructions
Table Of Contents
- OPERATING INSTRUCTIONS
- Table of Contents
- 1 General Information
- 2 Safety
- 3 Scope of Delivery
- 4 Equipment Specifications
- 5 Functional Description
- 6 Storage and Transport
- 7 Installation
- 8 Commissioning
- 9 Operation
- 10 Maintenance
- 11 Decommissioning and Dismantling
- List of Tables
- List of Figures

Protect PV.600/800 OD Series - Operating Instructions
Page 86 of 100 8000041160 BAL
i
The owner must draw up a safe disconnection procedure and
brief personnel on this.
The respective owner is responsible for correct maintenance of the
units and the equipment. This also applies to system components
that fall within the responsibility of the grid operator.
In order to ensure uninterrupted availability of the equipment, pre-
ventive maintenance work should be carried out based on the
maintenance schedule. Regular maintenance reduces the risk of
breakdowns and disruption due to technical faults.
To maintain the validity of the warranty:
• Regular maintenance must be carried out and documented ac-
cording to the maintenance schedule.
• Only original AEG PS spare parts (or spare parts purchased
from AEG PS) may be used.
For further details, please refer to the provisions of the individual
contracts.
i
The owner must define work instructions for carrying out
maintenance work, giving details of:
- Ambient conditions
- Tools, equipment, means of protection and auxiliary equip-
ment
- Suitable personal protective equipment and organisational
safety measures.
i
Maintenance work must be carried out in accordance with
BGV A3 (DIN VDE 0100/VDE 0105) and DIN 31051
(DIN EN 13306).
10.1 Obligation to Keep a Written Record
Inspection results and details of any maintenance work carried out
must be recorded in writing. Experience has shown that the best
way to document inspection results is in the form of a test report.
The following information must be recorded:
Maintenance schedule
•
Date of the measure carried out
•
Work performed
•
Any special notes on the work performed
•
Persons who carried out the work
•
Signatures of the persons who carried out the work
•
Signature of the person responsible (supervisor)
•