Operating instructions

Table Of Contents
Protect PV.600/800 OD Series - Operating Instructions
8000041160 BAL Page 89 of 100
i
All measuring and monitoring devices used for testing must
comply with standards DIN VDE 0413/EN 61557 and
DIN 0404 and must be tested and calibrated regularly in ac-
c
ordance with ISO 9001:2000.
The equipment has various diagnostic functions (some of which
are optional), which can significantly reduce the time required for
maintenance work and troubleshooting.
Self-diagnosis:
This is activated when the equipment is switched on. Internal auxil-
iary programs monitor the bus system, the control PCBs and the
sensors (amongst other things), and signal any faults that occur.
Data logger:
Measured data, parameters and fault indications are saved contin-
uously. Measured data and performance data, as well as fault his-
tories, can be read out and evaluated as required.
i
The operating instructions describe how to output perfor-
mance and fault histories.
Repeat tests as part of maintenance must be carried out in ac-
cordance with BGV A3 to verify that the equipment is in perfect
working order. They must be carried out by personnel with electro-
technical training at stipulated times.
At stipulated times, the user must check that the fault current, dif-
ferential current and fault voltage protection devices are function-
ing properly.
AC mains at terminal X3
DC voltage with inverter switched off
Check remote signalling contacts:
Check remote alarm signals
Check DOU
Check the earth connectors:
Check the earth connectors
Measure contact resistance
Perform an insulation test:
Individual measurement via mega-ohmmeter
Start the insulation test manually
The manual insulation test is carried out in accordance with
Chapter 5.4.2 - Thin-Film Solar Cells.