Operating instructions

Protect PV.500/630-MH - Operating Instructions
8000043212 BAL Page 15 of 45
7 Assembly
DANGER
Suspended loads during transport
Possibility of death or crushing.
Select lifting gear according to the total weight to be
transported.
Do not step under suspended loads.
Secure the danger zone.
Wear personal protective equipment.
7.1 Foundation
The Protect PV.xxx-MH requires a frost-proof foundation with a
min. depth of 80 cm.
The foundation should be a 25 cm wide, transversely reinforced
continuous footing with openings for feeding the cable through on
the gable sides.
1 2 3
Figure 8 - Prefabricated foundation
1 Prefabricated foundation
2 Cable feed-through
3 Transport anchor M18
The owner is responsible for building the foundation. A
prefabricated foundation may be used as an option.
M18 eye bolts must be removed from the prefabricated
foundation's anchors after transportation/assembly.