Operating instructions

Protect PV.500/630-MH - Operating Instructions
Page 16 of 45 8000043212 BAL
7.2 MH Station
Before assembling the MH station, lead the cables to the
installation location on the DC and AC sides and position them
within the foundation so that they are ready to enter the station.
1 2 3 4
Figure 9 - Cable feed-throughs
1 Base structure
2 MH floor
3 DC cable feed-through
4 AC cable feed-through
When setting down the MH station, feed in the cables and avoid
crushing them under the base structure.
The MH station is screwed to the foundations to ensure its stability.
1 1
2 3
Figure 10 - Bracket assembly
1 Assembly brackets
2 Screws in bracket position
3 Anchor bolts
Holes (sealed with screws) are provided in the base structure at
the positions intended for brackets.