Operating instructions

Protect PV.500/630-MH - Operating Instructions
Page 26 of 45 8000043212 BAL
The owner is responsible for correct maintenance of the systems
and the equipment. This also applies to system components that
fall within the responsibility of the grid operator.
In order to ensure uninterrupted availability of the equipment,
preventive maintenance work should be carried out based on the
maintenance schedule. Regular maintenance reduces the risk of
breakdowns and disruption due to technical faults.
To maintain the validity of the warranty:
Regular maintenance must be carried out and documented
according to the maintenance schedule.
Only original AEG PS spare parts (or spare parts purchased
from AEG PS) may be used.
For further details, please refer to the provisions of the individual
contracts.
i
The owner must define work instructions for carrying out
maintenance, giving details of:
- Ambient conditions
- Tools, equipment, means of protection and auxiliary
equipment
- Suitable personal protective equipment and organisational
safety measures.
i
Maintenance must be carried out in accordance with BGV A3
(DIN VDE 0100/VDE 0105) and DIN 31051 (DIN EN 13306).
i
AEG PS will rescind all obligations such as warranty
agreements, service contracts, etc. entered into by AEG PS or
its representatives without prior notice, in the event of
anything other than original AEG PS spare parts being used.
10.1 Obligation to Keep a Written Record
Inspection results and details of any maintenance carried out must
be recorded in writing. Experience has shown that the best way to
document inspection results is in the form of a test report.
The following information must be recorded:
Maintenance schedule
Date of the measure carried out
Work performed
Any special notes on the work performed
Persons who carried out the work
Signatures of the persons who carried out the work
Signature of the person responsible (supervisor)