Operating instructions
Protect PV.500/630-MH - Operating Instructions
Page 38 of 45 8000043212 BAL
3. Remove DC connections and PE cables.
4. Remove PV.xxx-ID AC connections and PE cables in the low-
voltage main distribution (top).
5. Disconnect and remove the power supply, emergency
shutdown and communication connections from the PV.xxx-ID.
6. Secure the cables in the equipment.
1 2 3
Figure 27 - Dismantling the Protect PV.5x0/6x0
Z (M1:1) Z (M1:1)
Sechskantschraube M12 x 30 M12 x 30 hexagon screw
Scheibe A12 A12 washer
1 MH base structure
2 MH mounting rail
3 M12 x 30 screw connection
7. Unscrew and remove all M12 x 30 hexagon screws fastening
the equipment in place. For the screw connections at the rear,
you may need to use a tool extension.
8. Push the forks of a telescopic loader into the openings in the
base structure underneath the equipment, lift gently and
reverse with caution. Always keep the equipment vertical when
lifting and do not tilt.
To coordinate the positioning and insertion of the PV.xxx-ID in the
MH station from the rear, the service flap in the rear wall should be
opened.
Pay attention to the earth connection when lifting the equipment in
and out.
Installation is the same procedure in reverse.