User's Manual

7
Fig. 1 Control characteristic for U control 17
Fig. 2 Total set point 17
Fig. 3 Switch-on fault bridging 20
Fig. 4 Absolute value monitoring 21
Fig. 5 Relative monitoring 21
Fig. 6 Local operating and display unit (LBA) 25
Fig. 7 Operation display 32
Fig. 8 Cabinet installation kit 34
Fig. 9 Example for the user interface Thyro-Tool Familiy 35
Fig. 10 File component mounting diagram control device 45
Fig. 11 Interfaces of Thyro-P 46
Fig. 12 Connection of a PC to Thyro-P via RS 232 47
Fig. 13 X10-allocation 48
Fig. 14 Signal converter RS 232/fibre optic 49
Fig. 15 Schematic diagram fibre optic Thyro-P with LLV and PC 50
Fig. 16 Profibus slot card 52
Fig. 17 Special function Motorpoti 53
Fig. 18 Special inputs 54
Fig. 19 Modbus slot card 55
Fig. 20 ASM wiring 57
Tab. 1 Behaviour in case of load change 19
Tab. 2 Partial load breakdown with heating elements switched in parallel, undercurrent 22
Tab. 3 Partial short-circuit with heating elements switched in series, overcurrent 23
Tab. 4 Overview monitoring 23
Tab. 5 Functions of the LBA-keys 26
Tab. 6 LBA main menu 27
Tab. 7 Copying function using the LBA 32
Tab. 8 Line diagram time base 33
Tab. 9 Elements of the status line 33
Tab. 10 Allocation of the message register 37
Tab. 11 Terminal strip X1 38
Tab. 12 RESET 39
Tab. 13 Controller lock 39
Tab. 14 QUIT 40
Tab. 15 Current transformer 41
Tab. 16 Voltage transformer 41
Tab. 17 Voltage measurement jumper 42
Tab. 18 Terminal strip X2 for K1, K2, K3 42
Tab. 19 Terminal strip X5 43
Tab. 20 Terminal strip X6 43
Tab. 21 Terminal strip X7 44
Tab. 22 Synchronization jumper 44
Tab. 23 Fibre optic distances 49
Tab. 24 Profibus baud rates 51
Tab. 25 Pin assignment X21 53
SCHEDULE OF ILLUSTRATIONS AND TABLES