ENGLISH CONTENTS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.
1. DESCRIPTION OF THE ESPRESSO MACHINE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.
2. DESCRIPTION OF THE CONTROL PANEL: TOUCH KEYS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
3. SAFETY INSTRUCTIONS Using this machine is very easy. However, please read this instruction manual carefully and thoroughly before installing and operating this machine for the first time, so that any wrong operation can be avoided, the best and safest performance can be ensured, and environment will be protected. DURING THE OPERATION CAUTION: The filtering unit will always be kept very hot to obtain an excellent coffee. Therefore please use this machine with extreme care to avoid being scalded.
FOR INSTALLATION AND SERVICING − − − This machine must be installed and connected to the mains by a SKILLFUL ENGINEER. Make sure that the machine is DISCONNECTED from the power supply before any servicing operation. After unpacking the machine make sure that the product has not suffered any damage and that the power cord is in perfect conditions. Otherwise, before switching the machine on contact your retailer immediately.
4. INSTRUCTIONS FOR THE FIRST USE OF THE MACHINE FILLING UP THE WATER RESERVOIR − Press the unlocking levers available under the drip tray and pull the machine as it is shown in the figure. − Extract the espresso machine out of the cabinet sliding on the special slides.
Hardness of water: − Before filling up the water reservoir, make sure that the decalcifying Brita filter has been soaked in cold water for at least 30 min. (however follow the instructions printed on the filter package). After this operation insert the filter into its proper seat inside the reservoir as it is shown in the figure.
− Insert the machine into the cabinet pushing slightly until “CLIK!” can be heard: this is the signal that the machine has been locked. FILLING UP THE CONTAINER OF COFFEE BEANS − Press the unlocking levers available under the drip tray and pull the machine as it is shown in the figure. − Extract the espresso machine out of the cabinet sliding on the special slides.
− Pour approximately 200 g of coffee beans into the container availabe on the right side of the machine − Insert the machine into the cabinet pushing slightly until “CLIK!” can be heard: this is the signal that the machine has been locked. SIGNALLING WATER MISSING IN RESERVOIR ?? This machine is equipped with a sensor detecting the presence of water in the reservoir.
PRELIMINARY STARTING: FIRST USE 10 − After filling up the water reservoir, open the steam/water cock as it is shown in the figure. − Switch the espresso machine on by keeping the on-off/stand-by button pressed until the red LED stops flashing and is kept on. This indicator will signal the operating condition of the machine (flashing: STAND-BY; lit ON; out OFF). − At the same time the red indicator of heating will be on; this LED indicates the heating phase of the water inside the boiler.
− After the water has flowed out (if necessary, repeat the draining operation several times), close the knob again. − As soon as the heating LED goes out, the machine has reached the right temperature and it is ready to make coffee. Only the on-off indicator is kept on. RESETTING STANDARD VALUES − This espresso machine is calibrated in factory to make the optimum Italian espresso, as approved by the coffee University of Naples and complying with ILLY standards.
− A faint flashing of all the LEDs will signal that the factory values have been reset. N.B.: The standard values only concern the quantity of water required for each cup of coffee. Then the measures of ground coffee will not vary. CAUTION – ADJUSTING THE GROUND COFFEE − This machine is calibrated in factory for an ideal level of coffee grinding. The success of a good espresso depends on this grinding level very much.
− Extract the espresso machine out of the cabinet sliding on the special slides. − Turning the proper adjusting knob (A-10) will modify the grounding level. Turning the knob in clockwise direction will lead to a fine grinding for a stronger coffee. Turning the knob anti-clockwise will lead to a coarse grinding for a weaker coffee.
STAND-BY MODE − Once powered and inserted into the cabinet, the machine is in stand-by mode: this will be signaled by the on/off LED blinking. − Keep the on/off button pressed as it is shown in the figure. − As soon as the machine is ready to operate, the LED will be kept on as it is shown in the figure. Repeat the operation to enable the STAND-BY mode again. 5.
6. DRAWER (OPTIONAL) − - This machine can also be provided with an optional well-equipped drawer mod. PES 8036-m, with front panel of stainless steel. This drawer has a lot of useful compartments: a large compartment for cups and saucers a basin for coffee grounds a compartment for all accessories (filters, measuring spoon) a tray 7. COFFEE USING COFFEE BEANS − Turn the knob (B-19) to the desired coffee measure.
− Insert the filter holder under the coffee measuring device by pressing the proper button slightly: thus the right quantity of ground coffee will automatically fall into the filter. − When the filter has been filled with the desired quantity, press the ground coffee with the pressing tool − Insert the filter holder into the locking nut correctly.
− Lock the filter holder perfectly turning its handle from left to right. − When preparing an espresso, use the proper grille inserting its feet into the four special holes − Lay the grille firmly checking its stability. Position the cup/s under the nozzle and make sure that the red LED of water temperature is out, or wait until it goes out.
− Press the coffee button and the quantity of coffee in the cup will be that selected and recorded before. Remove the filter holder from the nut and eliminate the ground coffee already used. − When the two-cup nozzle is used, the two cups od coffee are not always filled at the same level.
− − This machine is also prearranged to operate with paper pods, that is throwaway portions of roasted coffee (for only one cup of coffee). Carry out the same operations like in the case of ground coffee; after coffee has been poured into the cup, remove the filter holder from the locking nut and eliminate the used pod. HOW TO PREPARE AN EXCELLENT ESPRESSO − − − − − − − A clean machine and the right temperature are the most important elements for preparing a good espresso.
8. HOT WATER − The steam/water pipe is of foldaway type: extract by rotating as it is shown in the figure.. − Place a container under the steam/water nozzle; then turn the steam/water knob in anticlockwise direction. − Press the button of hot water and the nozzle will spray the quantity of water stored before; if necessary, press the button of water again to stop its spraying.
− Close the steam/water knob again. 9. STEAM HEATING LIQUIDS − Press the steam button once. Both the LEDs of steam and water temperature will be ON. Wait until both these LEDs go out. Pressing the steam button again will stop generating steam. − Pressing the steam button again will check whether steam has been generated: if the LED of water temperature is kept out, steam is ready to be sprayed.
− Place a pot with the liquid to be heated under the steam nozzle and turn the steam knob in anticlockwise direction. − Wait until the liquid warms up and then close the steam knob. − Attention: when preparing milk for cappuccino, shake the milk jug a little to improve the result. − Caution: never make coffee when steam is ready; if this is the case, first of all reset the water level in the boiler as it will be explained at the next paragraph.
10. PROGRAMMING THE QUANTITY OF GROUND COFFEE − − This espresso machine has already been calibrated in factory to dispense the ideal measure of ground coffee for one cup of espresso. However this quantity of ground coffee can be increased or reduced, then the selected measure is stored. The programmable measure of ground coffee only refers to one cup of coffee. Grinding time for selecting a measure of double coffee is set automatically after the measure for a single coffee has been stored.
11. PROGRAMMING THE QUANTITY OF COFFEE POURED IN THE CUP − The quantity of coffee being poured can be adjusted as desired. Turn the coffee measuring knob onto the LED of the required “coffee measure” and grind a measure of coffee in the filter holder. Insert the filter holder in the locking nut, then put one or two cups under the filter holder according to the selected programme. − Keep the coffee button pressed for approximately 5 seconds to enter the programming mode.
− Once obtained the desired quantity of coffee press the button again and this coffee measure will be stored automatically. 12. PROGRAMMING THE QUANTITY OF HOT WATER − Place a pot under the steam/water nozzle and turn the steam/water knob anticlockwise. − Keep the water button pressed for approximately 5 seconds to enter the programming mode (during this phase the water LED will blink).
− Release the button when the water starts flowing out; then, once obtained the desired quantity of water press the button again and this measure will be stored automatically. − Then close the steam/water knob again. 13. RECIPES ITALIAN CAPPUCCINO This is a normal espresso with steam-heated milk giving the coffee a milder flavour and a rich, delicious frothy topping. Serve in a large cup.
COLD ESPRESSO SHAKE Frothy and extremely refreshing, this drink is delicious on hot days. Prepare an espresso, add sugar and pour into a shaker with large ice cubes. Shake for few seconds. Serve in a tumbler or flûte. IRISH COFFE Energy-giving and invigorating drink. Warm a long glass and mix eight parts of hot coffee with one part whisky and brown sugar.
DRIP TRAY − − Remove the drip tray from the machine as it is shown in the figures above. Make sure that the drip tray is periodically drained to prevent any liquid from seeping out and dirtying/damaging the underlying furniture. Drip tray and relevant grille can be washed in a dishwasher. FILTER – FILTER-HOLDER – LOCKING NUT − 28 Always keep filters, filter-holder and locking nut clean. In fact any coffee residue can alter the taste of the next cups of coffee and provoke leaks.
− The steam nozzle should be periodically cleaned. Preparing milk for cappuccinos could dirty the inside of this nozzle. Therefore remove it as it is shown in the figures above and wash with a sponge in warm water. Attention: Before cleaning the steam nozzle, always switch the machine off and wait for at least 20 minutes so that the steam pipe can cool down. This will avoid the risk of scalding.
COMPONENTS FOR INSTALLING THE MACHINE This espresso machine will be installed into cabinets with height of 380 mm and width ranging from 560 mm to 568 mm. The machine is equipped with the following components for the installation: 1. 2. 3. 4. 5. 6. 7. 8. 1 fixing base 13 self-threading screws 3.
− Unscrew the cable clap available on the machine. − Fix the power cord onto the machine as it is shown in the figure. − Connect the power cord as it is shown in the figure. This machine is prearranged to be powered with single-phase voltage of 230 V (O/1/G). The power supply requires only outlets of 10 A protected by differential magnetothermal switch (230 V; 10 A; Id = 0.003 A) with distance of at least 3 mm between contacts.
INSTALLING THE MACHINE WITHOUT DRAWER − Lay the fixing base of the machine equipment on the shelf of the cabinet. − Insert the side plates for compensating for any space. The width of the compartment housing the espresso machine depends on the thickness of the cabinet’s sides. Four side plates (two being 2 mm thick and two 1 mm thick) are provided to compensate for the different possible measures.
− Fix the base plate inserting 4 selfthreading screws into the 4 fore holes of the same plate. Then assemble the 2 slides with the remaining 8 self-threading screws. − Insert the machine by coupling its slides with the supports mounted onto the cabinet’s sides. − Slide the machine into the cabinet to the stops until the safety locks close.
INSTALLING THE ALIGNING BAR − When this espresso machine is assembled in a composition of electric household appliances, it could be installed beside a oven 10 mm higher. Align the assembly fixing the proper bar under the frontal panel with the four screws M4x16, as it is shown in the figure. COMPONENTS FOR INSTALLING THE (OPTIONAL) DRAWER This drawer will be installed into compartments with height of 80 mm and width ranging from 560 mm to 568 mm.
INSTALLING MACHINE + DRAWER − Lay the fixing base of the drawer onto the proper shelf of the cabinet. − Insert the side plates of the drawer for compensating for any space. The width of the compartment housing the drawer depends on the thickness of the cabinet’s sides. Four side plates (two being 2 mm thick and two 1 mm thick) are provided to compensate for the different possible measures. They should be used to compensate for the internal width of the compartment, leading to a width of 562/560 mm.
− Fix the base plate inserting 4 selfthreading screws into the 4 fore holes of the plate. Then assemble the 2 slides with the remaining 10 self-threading screws. All these screws are supplied together with the drawer. − Position the fixing base of the machine laying onto the fixing base of the drawer. − Insert the side plates of the machine’s equipment for compensating for any space. The width of the compartment housing the machine depends on the thickness of the cabinet’s sides.
− Four side plates (two being 2 mm thick and two 1 mm thick) are provided together with the machine, to compensate for the different possible measures. They should be used to compensate for the internal width of the compartment, leading to a width of 562/560 mm. − Fix the base plate of the machine inserting 4 self-threading screws into the 4 fore holes of the same plate. Then assemble the 2 slides with the remaining 8 self-threading screws. All these screws are supplied together with the machine.
− Insert the machine coupling its slides with those already mounted onto the cabinet’s sides and slide it into the cabinet to the stops until the safety locks close. 16. WHAT TO DO IF... If this machine does not work, please make sure that the fault is not due to: 1. 2. no power no water in the reservoir. When the power cord is damaged or the machine needs servicing, please contact the nearest After-Sales Service Centre.
17. TECHNICAL SPECIFICATIONS As regards the general dimensions of the machine, please see the fig. D − Width 594 mm − Depth 260 mm − Height 378 mm − Capacity of water reservoir 2.
FUSES F1: Fuse Ø 5 x 20 mm - Vn = 250 V - In=10 A F2: Fuse Ø 5 x 20 mm – Vn = 250 V – In = 0.
18. DECLARATION OF GUARANTEE TERMS SERVICE & SPARE PARTS If you wish to purchase spare parts or require an engineer, contact your local AEG Service Force Centre by telephoning: 08705 929 929 Your telephone call will be automatically routed to the Service Centre covering your post code area. For the address of you local Service Force Centre or for further information regarding Service Force, please visit the website as www.serviceforce.co.
GUARANTEE CONDITIONS AEG offer the following guarantee to the first purchaser of this appliance. 1. The guarantee is valid for 12 months commencing when the appliance is handed over to the first retail purchaser, which must be verified by purchase invoice or similar documentation. The guarantee does not cover commercial use. 2. The guarantee covers all parts or components which fail due to faulty workmanship or faulty materials.