The insulation test can only be started manually if an insulation
test is not already running at the time.
5.3.4 Insulation Monitoring Parameters
All parameters are only relevant for operation with thin-film solar
cells.
Insulation test time:
The analogue and digital signals from the isometer are evaluated
during this time.
Delay for insulation test following shutdown of K21 (earthing
of PV cells):
Once the earthing has been disconnected, this time must elapse
before insulation measurement can start.
Delay for shutdown of K21 in night operation:
Once sequence control has switched to the "Night" status, this
time must elapse before earthing is removed with contactor K21.
Minimum time in maintenance mode:
If maintenance mode has been activated, the earthing is discon-
nected and remains so for at least this time.
5.4 MPP Tracker
In the "Operation" status (see Chapter 5.1.3), the inverter detects
the maximum power point (MPP) of the PV cells.
The MPP tracker detects the point at which the solar cells give off
maximum power.
This enables the system to achieve optimum efficiency.
Figure 9 MPP performance curve