Instruction Manual

Benchmark 750/1000 Boiler
CHAPTER 10. BOILER SEQUENCING TECHNOLOGY
Page 124 of 192 AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 OMM-0082_0J
05/21/2014 Ph.: 800-526-0288 GF-130
10.2 AERCO BST QUICK START CHART
Select the single option that suites your installation and then complete the instructions in the
corresponding sub-sections of section 10.3 BST Implementation Instructions.
Constant Setpoint (choose option 1 or 2)
Option 1Direct Wired Header
Complete section 10.3.1
OR
Option 2Modbus Header
Complete section 10.3.2
Outdoor Reset (choose option 3 or 4)
Option 3Direct Wired Header AND Direct Wired
Outdoor Air
Complete section 10.3.3
OR
Option 4Modbus Header AND Modbus Outdoor Air
Complete section 10.3.4
Remote Setpoint (choose option 5 through 8)
Option 5 – 4-20ma Drive AND Direct Wired Header
Complete section 10.3.5
OR
Option 6Modbus Drive AND Direct Wired Header
Complete section 10.3.6
OR
Option 7 – 4-20ma Drive AND Modbus Header
Complete section 10.3.7
OR
Option 8Modbus Drive AND Modbus Header
Complete section 10.3.8